Back to guidesMost expensive mistakes are made before the contract is signed: in capacity sizing, quote comparison and the sales forecast.
A plant that needs 200 kg/h of finished product does not need a 200 kg/h machine; it needs a line whose slowest stage delivers 200 kg/h after losses. Real product with real changeovers often runs 20-40% below the rated figure, and that gap decides whether the project pays back on time.
The guides here follow the order of the decision: capacity and supply format first, then the choice of supplier and equipment condition, and finally the economics: cost per kilo, payback, seasonality and producing for other brands.
Start from sales volume and the slowest stage, then decide who is responsible for the interfaces between machines.
Compare quotes on the same scope of supply: tooling, installation, training and spare parts are often not in the price.
Payback is calculated from the kilos you will sell, not from the kilos the line can make.
Money is lost on three assumptions. The line is bought on a peak catalogue figure and becomes idle capital or a bottleneck. Quotes are compared on price without noticing that one excludes installation and spare parts. Payback is calculated at full load, while in the first year the line runs a single shift.
A line costs least to the buyer who sized it on the real product and real sales, not on the price tag.
Equipment
Pages on selecting confectionery equipment, supply from Turkey and small-scale production.
Topics
Topic
Kudret Makine engineers confectionery and food-processing lines to your real production task and ships directly from the manufacturer.
Get a consultation